By the time the railways arrived in Manchester, the city was already built up, forcing trains to finish their journey on the edge of the urban area. To this day, it still has two main stations: Victoria, which sits on the northern edge of the city centre, and serves destinations across the north; and Piccadilly, which serves a smaller chunk of the north, but also provides trains to Birmingham, London and points south.

There are many ways in which this situation is less than ideal. For a start it means that travellers get off a train, only to find they’re still surprisingly far from the city centre. For another, terminating services take up more space (because you need more platforms) and time (because crews need to change ends) than through ones.

Then there’s Manchester Airport, the busiest in the north, used by travellers right across the region. But that’s to the south of the city, on a line into Piccadilly, which makes it annoyingly hard to get to by train.

The proposed PiccVic tunnel. Image: Wikimedia Commons.

So what with one thing and another, linking up Manchester’s two stations in some way has been an ambition for decades. In the mid-1970s, there was a plan for a “Picc-Vic” tunnel, which would have served five underground stations in the city centre – but that, inevitably, got cancelled due to lack of funds. The city council instead started to focus its efforts on the new Metrolink tram network; but while that’s been great for locals and commuters, it’s not done much for longer-distance travellers

A few weeks from today, though, trains will travel directly between Piccadilly and Victoria for the first time. To do so, they’ll use existing lines to the south and west of the city centre, as well as 300m of new track, known as the Ordsall Chord.

And, for reasons that aren’t exactly clear, the nice people at Network Rail let me have a go on their new bridge. Here I am, in my fetching new personal protective equipment:

Jacket, trousers, boots, gloves, eye protection, hard hat: all present and correct. Ability to take a remotely flattering selfie: conspicuous by its absence. Image: author provided.

(The trousers were my size, which was unexpected, because I hadn’t actually told Network Rail what size I was. This lead me to worry they kept a database of such things, but the press office assured me that this had literally never happened before, and was extremely unlikely to happen again. So anyway.)

The Ordsall Chord has been talked about for a very long time: parliament actually agreed to build the thing, then known as the Castlefield Curve, all the way back in 1979, just after the cancellation of the Picc-Vic tunnel. In some ways it’s an obvious missing link – remember we’re talking about just 300m of new track, costing under £100m, which isn’t that much as these things go. But Britain being what it is, it proved rather easier to persuade ministers to build London’s £15bn Crossrail instead.

A schematic of the new curve. Image: Wikimedia Commons.

In 2011, though, then chancellor George Osborne unexpectedly announced £85m of funding. The project somehow survived austerity and the new bridge, in the borderlands between Manchester and Salford, officially opened last week (although the first trains won’t run until next month).

A scale model of the new link, nearby in what was Manchester Liverpool Road station; it’s now a part of the Museum of Science & Industry. Image: author provided.

I say it’s a bridge: as it happens, it’s actually two bridges. The bit your eye is drawn to is a structure known as a “network arch”, which means those wires crosses at least two others. That part will carry trains over the River Irwell, which divides Manchester from Salford.

Beyond that, though, there’s a second bridge: a flat one, across a section of the inner ring road. Linking them is a slight dip in the metal sides of the bridge (though not, obviously, in the track).

A map of the area. New curve highlighted in yellow. Image: Google.

This, along with the asymmetrical shape of the arch which facilities it, is a purely aesthetic feature. So is the colour: the metal was allowed to rust in the Manchester climate, partly to protect it from the elements, but also to make it look cool. “We don’t want it to read as different structures as you look along the river,” Peter Jenkins, the head of transport at architects BDP and lead architect on the project, explained at the official opening ceremony. The design, he added, was “not uncharted, but rarely charted”.

To be fair, it is a great looking bridge: something that looks like a landmark, rather than just a piece of infrastructure. One of the guys who’d worked on the project told me, as a group of us stood on the bridge, that he hoped it would be illuminated at night, just to show it off and make it a feature of the city’s skyline.

(Incidentally, as excited as I was to go play on the bridge, it wasn’t entirely clear what I was meant to do once I got there. I tramped up and down a bit, took some pictures of the city’s skyline, and occasionally checked nervously that there was no way a train could get near me. But what was I actually meant to do? And what was a decent interval before it was acceptable to, y’know, get off the bridge again? Ah well, better take another photo I suppose.)

A view from a bridge. Image: author provided.

Looking good is all very well, of course, but what will the Ordsall Chord actually do? 


For a start, it’ll allow travellers from Yorkshire, the north east and other parts of the north to travel directly to the airport for the first time: that should hopefully work out well the airport, the road network and the wider economy.

It’ll also speed up journey times. Longer distance services will no longer have to reverse, or trundle all the way around Manchester on far-flung bits of track. Instead, they’ll be able to go straight around the city centre.

(Seriously, I’ve been up here 20 minutes now. Is it okay to get down again yet? Surely they must all have noticed that I have no idea what I’m doing right now. Surely.)

Mike Heywood, the director who managed the project for Network Rail, pointed me to another, less obvious benefit. At the moment, the various trains terminating at Piccadilly often have to cross each other’s paths to reach their platforms. This, if you don’t want trains to crash into each other, limits the number of trains you can actually run.

By diverting a share of trains via two new through-platforms and the chord, Heywood told me, you can reduce that, and add 25 per cent to Piccadilly’s capacity at a stroke.

The side view. Image: author provided.

Oh, and by making the new bridge look good, those who built it also hope it’ll help kick-start regeneration along a rather neglected stretch of the River Irwell, too.  Not bad for 300m of new track.

This is only one part of what the industry has termed the Great North Rail project. Others include an extra platform at Manchester Airport, electrification on assorted routes in the north west, and – best of all, given the state of the existing rolling stock – vast numbers of new trains, due to appear next year.


 The region’s transport network is still not getting anything like the care or attention that we take for granted in the south east, of course, but all the same, it’s nice to be able to write about a new railway line in the north for once. AND they let me go play on a bridge.

Jonn Elledge is the editor of CityMetric. He is on Twitter as @jonnelledge and also has a Facebook page now for some reason. 

Want more of this stuff? Follow CityMetric on Twitter or Facebook